Detail A. 2: Joint Reinforcement
- TYPICALLY USED WITH BOND BEAMS AT 2400mm BUT NOT WITH BOND BEAMS AT 1200mm
- JOINT REINFORCEMENT AS SPECIFIED:
- IN HIGHER SEISMIC ZONES EVERY SECOND COURSE (400mm)
- IN LOWER SEISMIC ZONES EVERY THIRD COURSE (600mm)
- 9 GAUGE WIRE LADDER STYLE
Download